The Kenya National Highways Authority (KeNHA) has announced a temporary closure of the Lower Kabete-Ndumbuini/Kapenguria-Uthiru Road Interchange to allow reconstruction works on the interchange ramps, loops and slip roads.
In a public notice dated Wednesday, November 25, KeNHA said the traffic disruption would take effect from December 2, 2026, to January 31, 2027.
The authority advised motorists using the interchange to observe the temporary traffic management plan and use alternative routes during the construction period.
“The Kenya National Highways Authority (KeNHA) would like to inform the public of a temporary traffic disruption following closure of Lower Kabete- Ndumbuini/ Kapenguria Road Uthiru Interchange. This is due to scheduled road works for reconstruction of the Interchange Ramps, loops and Slip Roads, from Wednesday, 2nd December 2026 to Sunday, 31st January 2026,” read part of the notice.
KeNHA Lists Alternative Routes for Motorists
KeNHA outlined alternative routes for motorists travelling between Nairobi, Ndumbuini, Rironi, Nakuru, Uthiru and Kawangware.
Motorists travelling from Nairobi to Ndumbuini will have two alternative routes. Those using Waiyaki Way (A8) can exit at Kabete Technical, proceed to Naivasha Road roundabout and use the Uthiru Underpass before turning back onto the Nairobi-bound carriageway.
They will then access Marigoini Cabro Road, which leads to Ndumbuini Shopping Centre. Alternatively, motorists can exit at Leadway Petrol Station, proceed to the Uthiru Underpass and follow the same route.
Those travelling from Rironi and Nakuru to Ndumbuini will turn at Muhuri Interchange and use the Muhuri-Ndumbuini Road.
Motorists travelling from Ndumbuini to Nairobi will use either Marigoini Cabro Road or Ndumbuini Road through the 87/Muhuri Interchange to access the Nairobi-bound carriageway.
Also Read:Â KeNHA Seeks Private Operator for Green Park Underpass in Nairobi CBD
Those heading towards Rironi will use the same Ndumbuini Road to access the Nakuru-bound carriageway.
Meanwhile, motorists travelling from Uthiru and Kawangware will use the Uthiru Underpass or Muhuri Interchange for all turning movements to and from Naivasha Road.
KeNHA urged motorists to follow traffic management signs and cooperate with police officers and traffic marshals deployed at the site throughout the construction period.
Also Read:Â KeNHA Unveils 25 New Road Links to Connect Kiambu Estates to Nairobi Western Bypass
Diversions
| Traffic direction | Alternative route |
|---|---|
| Nairobi to Ndumbuini | Exit at Kabete Technical, proceed to Naivasha Road roundabout, use Uthiru Underpass, turn back onto the Nairobi-bound A8 carriageway and access Marigoini Cabro Road to Ndumbuini Shopping Centre. |
| Nairobi to Ndumbuini (Alternative) | Exit at Leadway Petrol Station, proceed to Uthiru Underpass, turn back onto the Nairobi-bound A8 carriageway and use Marigoini Cabro Road. |
| Rironi/Nakuru to Ndumbuini | Turn at Muhuri Interchange and use Muhuri-Ndumbuini Road. |
| Ndumbuini to Nairobi | Use Marigoini Cabro Road or Ndumbuini Road through the 87/Muhuri Interchange to access the Nairobi-bound carriageway. |
| Ndumbuini to Rironi | Use Ndumbuini Road through the 87/Muhuri Interchange to access the Nakuru-bound carriageway. |
| Uthiru/Kawangware to and from Naivasha Road | Use Uthiru Underpass or Muhuri Interchange for turning manoeuvres. |
Follow our WhatsApp Channel and X Account for real-time news updates and our YouTube Channel for in-depth interviews.





