Motorists using Gitanga Road in Nairobi’s Kawangware area will face traffic disruptions later this month after the Kenya Urban Roads Authority (KURA) announced a temporary partial closure.
In a public notice, KURA said it would partially close a section of the road from 6:00 am on Thursday, November 26, to 6:00 pm on Saturday, December 5, 2026, to allow drainage construction works.
The closure will affect a section between kilometre 0+520 and kilometre 0+620, covering approximately 100 metres of the road.
According to the authority, the temporary closure will allow the safe construction of a cross culvert intended to improve drainage along the road corridor.
The works are expected to enhance water flow and address drainage challenges along the affected section.
“We wish to notify the general public that a section of Gitanga Road in Kawangware area will be partially closed as from 6 AM Thursday 26th November, 2026 till 6 PM Saturday 5th December 2026, both days inclusive,” KURA said.
“The temporary closure will enable safe construction of a cross culvert that will enhance drainage along the road corridor.”
KURA Lists Alternative Routes for Motorists
KURA has provided a traffic diversion plan showing alternative routes for motorists travelling through the affected area.
Drivers travelling from the Nairobi side towards Kawangware will be diverted through Macharia Road before joining Salim Road. They will then follow the marked route towards Kawangware and reconnect with the road beyond the closed section.
Motorists travelling from Kawangware towards Nairobi will use the opposite diversion. They will join Salim Road, proceed towards Macharia Road and follow the marked route back to Gitanga Road in the direction of Nairobi.
The authority has also provided a separate diversion for public service vehicles and heavy goods vehicles weighing more than 7.5 tonnes. These vehicles will be directed to use Naivasha Road instead of passing through the affected section of Gitanga Road.
Also Read: KeNHA Seeks Private Operator for Green Park Underpass in Nairobi CBD
KURA said a pedestrian walkway would remain open throughout the closure period, allowing people on foot to continue accessing the area.
Motorists have been urged to follow the diversion signs and instructions from traffic police officers and marshals deployed along the affected routes.
“We urge motorists to use the alternative routes shown in the sketch below and to follow the guidance of traffic police and marshals on site,” KURA added.
Also Read: Ruto Lists Major Roads and Highways Set for Construction and Dualling Across Kenya
KURA apologised to motorists and other road users for the inconvenience, urging them to plan their journeys in advance and use the designated alternative routes.
The authority said the temporary traffic arrangements would remain in place throughout the construction period, ending at 6 pm on December 5, 2026.
“We sincerely apologise for the inconvenience caused as we endeavour to Transform Urban Mobility,” the authority said.
Gitanga Road in Nairobi grew from a western suburban and peri-urban route linking areas such as Lavington, Kilimani, and Kawangware into a busy commercial, institutional, and commuter corridor.
Follow our WhatsApp Channel and X Account for real-time news updates and subscribe to our YouTube Channel for in-depth interviews.





